Updates and Results Talks and Posters Advice Ideas Important Figures Write-Ups Outreach How-To Funding Opportunities GENETIS
  GENETIS  ELOG logo
Message ID: 214     Entry time: Sun Apr 30 03:45:07 2023
Author: Alex M 
Subject: Preliminary PUEO Run 

We have the PUEO loop in working order, though there are a few errors in accuracy and efficiency. We started a preliminary run with few individuals and neutrrinos as a large scale test that may still give us some useful data. 

For this run, we are only evolving the inner side length (10cm to 25 cm) and height (10 cm to 50 cm). The walls are slanted at 45 degrees, so the outer length is completely defined by those two. The ridges are kept at 6 cm wide and 4 cm from the walls at the base. The curvature is set to 0,1 and the ridges are set to have the same height as the walls. 

At the moment, we are using 24 individuals and 300,000 neutrinos. I'll update this ELOG post with more details from the run as they emerge.

Attachment 1: PUEO_run_details.txt  2 kB  Uploaded Sun Apr 30 04:50:20 2023  | Show | Show all
ELOG V3.1.5-fc6679b