Updates and Results Talks and Posters Advice Ideas Important Figures Write-Ups Outreach How-To Funding Opportunities GENETIS
  GENETIS, Page 11 of 13  ELOG logo
ID Date Author Subjectdown Text Attachments
  64   Mon Jun 8 15:16:16 2020 Alex PattonDaily GENETIS Update 6/8/20


Name
Today's
Update
Plans for Tomorrow


Alex
M.

Worked with Alex
  
  63   Fri Jun 5 14:29:56 2020 Alex PattonDaily GENETIS Update 6/5/20


Name
Today's
Update
Plans for Monday


Alex
M.

Helped Alex P try
  
  61   Wed Jun 3 15:02:00 2020 Alex PattonDaily GENETIS Update 6/3/20


Name
Today's
Update
Plans for Tomorrow


Alex
M.

Talked with Alex
  
  60   Tue Jun 2 13:42:21 2020 Alex PattonDaily GENETIS Update 6/2/20


Name
Today's
Update
Plans for Tomorrow


Alex
M.

Worked with Alex
  
  59   Mon Jun 1 15:21:03 2020 Alex PattonDaily ELOG Update 6/1/2020


Name
Today's
Update
Plans for Tomorrow


Alex
M.

Spoke with Evelyn
  
  56   Wed May 27 15:00:28 2020 Alex PattonDaily ELOG Update 5/27/2020


Name
Today's
Update
Plans for Tomorrow


Alex
M.

Met with Alex P.
  
  54   Fri May 22 11:25:47 2020 Alex MachtayDaily ELOG Update 5/22/20


Name
Update
for today
Plans for tomorrow


Alex
  
  239   Fri Sep 1 09:16:30 2023 Alex MCurved Run With Realized GainWe are beginning a new run with several
improvements to the ARA VPol loop to try
to evolve antennas that are optimally matched
 run_details_curved_realized.txt 
  Draft   Mon Mar 6 00:07:32 2023 Dylan WellsCurrent Status of PUEO and To Do List for Hackathon I went through the current PUEO
Loop  and documented everything
that still needs to be accomplished before
  
  130   Mon Mar 15 13:05:22 2021 Alex MCurrent RunWe are currently running the loop using
the improved parameters. The parameters are
as follows:
  
  183   Mon Oct 24 16:07:22 2022 Dylan WellsCreating the matching circuit designThe first part of designing the matching
crictuit was choosing a frequency range to
match over. We chose 100 MHz to 1000 MHz.
  
  187   Mon Dec 5 17:46:40 2022 Dylan WellsConstraints on PUEO evolved antennas Variables of Evolved Antennas

Wall variables:
S -- length of bottom of the walls
  
  181   Thu Aug 18 13:03:47 2022 Dylan WellsComparing inputs and outputs between AraSim and IceMCComparing Inputs:

Frequency Lists:

Ara - 83.33MHz - 1066.70
  
  170   Tue Jun 28 13:27:13 2022 Dylan WellsChanges needed for the matching circuit script

Fix
the functions for the SLPC, SCPL, and PLSC
L networks (change the paramaters to match
  
  243   Mon Jun 2 14:10:59 2025 Jacob WeilerBuilding Status 06/02/2025We are almost to where we can start the
physical building of the antenna! 

I've attached all the information
 Building_Dump_of_Useful_Materials.txtSimulating_Building_Model.txtBuilding_Dump.txtdone_with_change_materials.zip 
  194   Mon Feb 13 14:56:57 2023 Jack TillmanBuilding - Physics Plots for 9_50, 13_84, 18_89, 19_96, 29_87 AntennaePhysics plots were created for 300K events
from the higher statistic simulation results
for the 9_50, 13_84, 18_89, 19_96, and 29_87
 Genetis_Physics_Plot_Comparison_Slides.pdf 
  230   Thu Jul 6 14:52:09 2023 Jack TillmanBuilding - Matching Circuit Schematic, PCB, and componentsAttached are images of the matching circuit
schematic and PCB design. A parts list is
also attached in .pdf and .csv format. The
 Matching_Circuit_Schematic.pngMatching_Circuit_PCB.pngMatching_Circuit_DigiKey_Cart.pdfMatching_Circuit_DigiKey_Cart.csv 
  193   Fri Feb 10 15:55:53 2023 Jack TillmanBuilding - Matching Circuit PCBI've completed laying out the PCB for
the 14-rung matching circuit. Attached are
png files of two PCB designs. One uses LPS5050
 LPS5050_Dimensioned_PCB.pngLPS6235_Dimensioned_PCB.png 
  189   Tue Jan 31 11:30:54 2023 Audrey ZinnBuildingAttached are the XF files for the top 5
individuals from the 2022_12_29 crazy sides
run. In order from best to 5th best: 
 XF_model_13_84.txtXF_model_9_50.txtXF_model_18_89.txtXF_model_19_96.txtXF_model_29_87.txt 
  2   Wed Feb 6 17:28:29 2019 Julie RollaBicone User Manual (w/ links to Dipole work)Hi all, 

 

The working copy of the user manual
 GENETIS_Manual_1_25_19.pdf 
ELOG V3.1.5-fc6679b