| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
64
|
Mon Jun 8 15:16:16 2020 |
Alex Patton | Daily GENETIS Update 6/8/20 |
Name
Today's
Update
Plans for Tomorrow
Alex
M.
Worked with Alex |
|
|
|
63
|
Fri Jun 5 14:29:56 2020 |
Alex Patton | Daily GENETIS Update 6/5/20 |
Name
Today's
Update
Plans for Monday
Alex
M.
Helped Alex P try |
|
|
|
61
|
Wed Jun 3 15:02:00 2020 |
Alex Patton | Daily GENETIS Update 6/3/20 |
Name
Today's
Update
Plans for Tomorrow
Alex
M.
Talked with Alex |
|
|
|
60
|
Tue Jun 2 13:42:21 2020 |
Alex Patton | Daily GENETIS Update 6/2/20 |
Name
Today's
Update
Plans for Tomorrow
Alex
M.
Worked with Alex |
|
|
|
59
|
Mon Jun 1 15:21:03 2020 |
Alex Patton | Daily ELOG Update 6/1/2020 |
Name
Today's
Update
Plans for Tomorrow
Alex
M.
Spoke with Evelyn |
|
|
|
56
|
Wed May 27 15:00:28 2020 |
Alex Patton | Daily ELOG Update 5/27/2020 |
Name
Today's
Update
Plans for Tomorrow
Alex
M.
Met with Alex P. |
|
|
|
54
|
Fri May 22 11:25:47 2020 |
Alex Machtay | Daily ELOG Update 5/22/20 |
Name
Update
for today
Plans for tomorrow
Alex |
|
|
|
239
|
Fri Sep 1 09:16:30 2023 |
Alex M | Curved Run With Realized Gain | We are beginning a new run with several
improvements to the ARA VPol loop to try
to evolve antennas that are optimally matched |
|
|
|
Draft
|
Mon Mar 6 00:07:32 2023 |
Dylan Wells | Current Status of PUEO and To Do List for Hackathon | I went through the current PUEO
Loop and documented everything
that still needs to be accomplished before |
|
|
|
130
|
Mon Mar 15 13:05:22 2021 |
Alex M | Current Run | We are currently running the loop using
the improved parameters. The parameters are
as follows: |
|
|
|
183
|
Mon Oct 24 16:07:22 2022 |
Dylan Wells | Creating the matching circuit design | The first part of designing the matching
crictuit was choosing a frequency range to
match over. We chose 100 MHz to 1000 MHz. |
|
|
|
187
|
Mon Dec 5 17:46:40 2022 |
Dylan Wells | Constraints on PUEO evolved antennas | Variables of Evolved Antennas
Wall variables:
S -- length of bottom of the walls |
|
|
|
181
|
Thu Aug 18 13:03:47 2022 |
Dylan Wells | Comparing inputs and outputs between AraSim and IceMC | Comparing Inputs:
Frequency Lists:
Ara - 83.33MHz - 1066.70 |
|
|
|
170
|
Tue Jun 28 13:27:13 2022 |
Dylan Wells | Changes needed for the matching circuit script |
Fix
the functions for the SLPC, SCPL, and PLSC
L networks (change the paramaters to match |
|
|
|
243
|
Mon Jun 2 14:10:59 2025 |
Jacob Weiler | Building Status 06/02/2025 | We are almost to where we can start the
physical building of the antenna!
I've attached all the information |
   |
|
|
194
|
Mon Feb 13 14:56:57 2023 |
Jack Tillman | Building - Physics Plots for 9_50, 13_84, 18_89, 19_96, 29_87 Antennae | Physics plots were created for 300K events
from the higher statistic simulation results
for the 9_50, 13_84, 18_89, 19_96, and 29_87 |
|
|
|
230
|
Thu Jul 6 14:52:09 2023 |
Jack Tillman | Building - Matching Circuit Schematic, PCB, and components | Attached are images of the matching circuit
schematic and PCB design. A parts list is
also attached in .pdf and .csv format. The |
   |
|
|
193
|
Fri Feb 10 15:55:53 2023 |
Jack Tillman | Building - Matching Circuit PCB | I've completed laying out the PCB for
the 14-rung matching circuit. Attached are
png files of two PCB designs. One uses LPS5050 |
 |
|
|
189
|
Tue Jan 31 11:30:54 2023 |
Audrey Zinn | Building | Attached are the XF files for the top 5
individuals from the 2022_12_29 crazy sides
run. In order from best to 5th best: |
    |
|
|
2
|
Wed Feb 6 17:28:29 2019 |
Julie Rolla | Bicone User Manual (w/ links to Dipole work) | Hi all,
The working copy of the user manual |
|