Entry  Wed Aug 2 00:17:32 2023, Jacob Weiler, XF Antenna Drawing Progress 08/02/2023 sidepic.PNGcircuitboardplacement.PNGfullpic.PNGstruts.PNG
I've been building in XF and have ran into some issues but currently have the following completed:

- Struts are placed, though they are not evenly spaced and the same. I have contacted XF to try and figure out how to get rotation/patterns to
do what we need
Entry  Tue May 21 09:55:57 2024, Jacob Weiler, AraSim CSE Spring 2024 Work 
# AraSim CSE Spring 2024 Work

## Goals 
The main goal was to get a working multithreaded version of the AraSim codebase working. Doing this, the hope was to learn how to multithread the
Entry  Mon Jun 2 14:10:59 2025, Jacob Weiler, Building Status 06/02/2025 Building_Dump_of_Useful_Materials.txtSimulating_Building_Model.txtBuilding_Dump.txtdone_with_change_materials.zip
We are almost to where we can start the physical building of the antenna! 

I've attached all the information I currently have regarding the building project. Some of it is messy work notes and some is well-structured.

I’ve attached the following files for the GENETIS building project:
    Reply  Fri Mar 27 01:38:52 2026, Jacob Weiler, XF Antenna Drawing Progress 08/02/2023 
 




Quote:



I've been building in XF and have ran into some issues but currently have the following completed:
Entry  Wed Apr 1 02:33:44 2026, Jacob Weiler, pueoSim Input Files 
Input File Format for pueoSim (Also ICEMC)

Frequency Range: From 200 MHz to 1500 MHz incrementing by 10 MHz steps

 

There are 8 different files that are required for pueoSim. They are:
Entry  Fri Feb 10 15:55:53 2023, Jack Tillman, Building - Matching Circuit PCB LPS5050_Dimensioned_PCB.pngLPS6235_Dimensioned_PCB.png
I've completed laying out the PCB for the 14-rung matching circuit. Attached are png files of two PCB designs. One uses LPS5050 inductors while the
other uses LPS6235 inductors. The dimensions shown are in millimeters. 
Entry  Mon Feb 13 14:56:57 2023, Jack Tillman, Building - Physics Plots for 9_50, 13_84, 18_89, 19_96, 29_87 Antennae Genetis_Physics_Plot_Comparison_Slides.pdf
Physics plots were created for 300K events from the higher statistic simulation results for the 9_50, 13_84, 18_89, 19_96, and 29_87 antennae. 

The simulation was inaccurate because a discrepancy exists between the higher simulation physics plots and the physics plots created for the
300K event results currently in the GENETIS Loop. This can be seen in the attached pdf file. 
Entry  Sun Feb 19 17:12:34 2023, Jack Tillman, Physics Plots - 9_50, 13_84, 18_89, 19_96, 29_87 Feb2023_Physics_Plots_Powerpoint.pdfCrazy_Sides_Triggered_Event_Data.pdf
Attached is a pdf of physics plots generated for the 9_50, 13_84, 18_89, 19_96, and 29_87 crazy sides individuals along with another containing information
on the amount of triggered events and effective volumes for each individual. The crazy sides individuals were simulated for 3 million events using
the same Arasim version as is currently in the loop.
Entry  Thu Jul 6 13:12:04 2023, Jack Tillman, Straightened Sides AraSim Results  Straightened_Sides_AraSim_Results.pdfStraightened_Sides_AraSim_Results.pptx
After discretizing and straightening the sides of the curved antenna that performed the best (Generation 13, individual 84) and running the antenna through
AraSim, the following results and physics plots were generated. 
Entry  Thu Jul 6 14:52:09 2023, Jack Tillman, Building - Matching Circuit Schematic, PCB, and components Matching_Circuit_Schematic.pngMatching_Circuit_PCB.pngMatching_Circuit_DigiKey_Cart.pdfMatching_Circuit_DigiKey_Cart.csv
Attached are images of the matching circuit schematic and PCB design. A parts list is also attached in .pdf and .csv format. The .csv format can be imported
into Digikey if necessary.  

Table of component values:
Entry  Mon Oct 5 21:06:29 2020, Everyone, Data Runs 
Machtay_20200831_Asym_Length_and_Angle    10 individuals
Machtay_20200911_Symmetric                             10 individuals, fewer
neutrinos
Entry  Fri Oct 2 17:11:25 2020, Ethan Fahimi, Update Friday 10/2/2020 Screen_Shot_2020-10-02_at_5.39.33_PM.png



Name
Update
Plans for Monday


Alex
M

 

 


Alex P
 
 


Eliot
 
 


Leo
Today
Entry  Mon Oct 19 17:02:12 2020, Ethan Fahimi, Daily Update 10/19 



Name
Progress
Plans


Alex
M
 
 


Alex P
 
 


Ryan
Alex
P. and I put the outer radius constraint into the Asymmetric our version of the algorithm. I have also created the pseudo-fitness function to be able to
Entry  Mon Oct 26 17:59:10 2020, Ethan Fahimi, Daily Update 10/26 fitness.png



Name
Progress
Plans


Alex
M
 
 


Alex P
 
 


Ryan
I
have the testing loop finished with plotted results now. The program was able to reach optimal results very quickly. It used 100% tournament selection
Entry  Fri Oct 30 17:30:16 2020, Ethan Fahimi, Daily Update 10/30 



Name
Progress
Plans


Alex
M
 
 


Alex P
 
 


Ryan

Attempted
to make a  new mutation function for the algorithm to try and address the concerns about hitting local maximums from Wednesday. Unfortunately, the
Entry  Mon Nov 30 16:59:39 2020, Ethan Fahimi, Daily Update 10/30 



Name
Progress
Plans


Alex
M
 
 


Alex P
 
 


Ryan

Attempted
to make a  new mutation function for the algorithm to try and address the concerns about hitting local maximums from Wednesday. Unfortunately, the
Entry  Mon Nov 30 17:00:31 2020, Ethan Fahimi, Monday Updates 



Alex M
Kicked the loop back up. Helped Ethan and Parker with their
projects during the working meeting.


Ryan
Changed the tournament/roulette ratio, reproduction_no, and crossover_no
to be read in variables in the GA to increase the quality of life when running the algorithm and to prep the code for some testing. Format for how to call
Entry  Fri Dec 11 17:47:48 2020, Ethan Fahimi, Friday Updates 



Ethan F
Fixed the issued AREA was having with finding test_{ind}.txt,
now to fix problems with finding Veff and the project should be working.


 
 


 
 


 
 


 
 


 
 


 
 


Entry  Tue Jan 26 17:17:41 2021, Ethan Fahimi, Tuesday Updates 01/26/2021 



Ethan F
Continued implementing some solutions the OSC helpdesk
gave me for fixing the unwanted extensions on the job output files.


 
 


 
 


 
 


 
 


 
 


 
 


Entry  Wed Jun 23 16:34:10 2021, Ethan Fahimi, Daily Update 6/23/2021 



Name
Progress
Plans


Alex
M
 
 


Lydon
 
 


Ryan

 

 


Ben
 
 


Ethan
With